Hydraulic Turbine Experiences
실적
Dangjin Steam Power Plant Hydraulic 1660KW * 3set 5MW parallel system panel Production /Total commissioning test |
Hydro power 9sector of 16sector for a four-river refurbishment project work : Sheet of parallel kepco, Engineering. Governor. AVR. Parallel system panel products, Control Lines Works, Remote Control, Total commissioning test.
|
K-water Pangyo booster pump station 200kW 380v*2set Hydraulic Panel & commissioning test. |
Yeongju-Dam Hydraulic Power( 500, 1500, 3000KW) Governor. AVR. Parallel system panel. Total commissioning test. |
SinBoryeong combined cycle power plant Hydraulic Power 3MW Governor.AVR. Parallel system panel .Total commissioning test, Remote Control, Electric works |
Jangseong-Dam Hydraulic Power 1.2M Induction motor * 4set Governor.AVR . total test |
K-water Angye Hydraulic Power 1000KW 6.6KV*1set Governor. AVR. Synchronous panel. commissioning test. |
Korea Rural Corporation Jeongu Hydraulic Power 50KW Induction generator Governor, control panel, remote control, commissioning test. |
Korea Rural Corporation Nakduc Hydraulic Power 50KW Induction generator Governor, control panel, remote control, commissioning test. |
Daejun sewage disposal plant Hydraulic Power 50KW Induction generator *4EA Governor, control, commissioning test. |
K-water Juam-Dam 60KW 380v*1set Governor.AVR. Synchronous panel, commissioning test. |